:Home> English Website common problem
I. Daily Maintenance
Cleaning & Inspection
Regularly remove dust from sensor surfaces using compressed air or approved cleaning agents (avoid corrosive solvents).
Check seals monthly with soap solution for leaks; replace aging O-rings promptly.
Parameter Monitoring
Verify display readings for abnormalities (e.g., ±5% deviation triggers calibration).
Record flow/temperature trends to detect early performance degradation.
II. Periodic Calibration
Zero Adjustment
Perform quarterly zero checks (monthly for trade metering) under no-flow conditions.
Ensure pipes are fully filled with media during calibration.
Laboratory Calibration
Return to factory every 1-2 years for full-scale calibration using standard weights (e.g., Micro Motion HPC).
Document calibration certificates and compare historical data.
III. Environmental & Installation Optimization
Vibration Control: Install rubber isolators or independent supports (>1m from vibration sources).
Temperature Management: Use insulation/heat tracing for fluids with large temperature swings (-40~70℃ range).
Stress Relief: Loosen flange bolts during installation to allow natural alignment before re-tightening.
IV. Troubleshooting
No Signal: Check power connections, shielding, and EMI sources.
Measurement Errors: Validate media properties (density, impurities) and sensor coil resistance.
Key Notes:
Follow manufacturer manuals strictly; involve professionals for explosion-proof scenarios.
Maintain digital logs of maintenance history and calibration records.
新闻资讯