Here's the professional translation maintaining the original structure and technical accuracy:


Steam Flow Meter Debugging Guide: 5-Step Quick Start‌


🔧 ‌Core Debugging Steps‌


Pre-Safety Checks‌ (⚠️ Mandatory!)


Close upstream valve → Open bypass valve to depressurize → Verify zero residual pressure (confirm gauge reads 0).


Power-On Self-Test‌


Vortex/Mass Flow Meters: Check transmitter status light (solid green = normal; flashing red = consult error code).

Differential Pressure (DP) Meters: Manually press diaphragm to verify zero point (recalibrate if offset >0.5%).


Critical Parameter Configuration‌


python

Copy Code

# Essential settings for saturated steam:

density_mode = "IAPWS-IF97"  # Global steam density formula  

pressure_comp = live_value  # Input from pressure transmitter  

temperature_comp = live_value if superheated_steam else auto_saturation_temp  



👉 90% reading errors stem from incorrect density calculation!


Zero Calibration‌ (Perform with empty pipeline)


DP Meters: Open equalizing valve → Adjust three-valve manifold to zero → Lock.

Vortex Meters: Press "Zero Adjust" (perform at night to avoid vibration interference).


Flow Verification‌


Cross-check via boiler output: Totalized flow ÷ time vs. meter reading (recalibrate if error >3%).

🚫 ‌Troubleshooting Cheat Sheet‌

Symptom Root Cause Quick Fix

Erratic readings Pipe vibration/steam hammer Reduce vortex meter gain sensitivity

No low-flow detection DP below range limit Switch rangeability (e.g., 1:10→1:30)

>20% undercounting Temp/pressure comp disabled Check transmitter signal wiring

"ERR" display Sensor overtemperature (>250°C) Add heatsink or use remote mount


Toolkit for Efficiency‌


Vibration test: App Viber + zip-tie phone to pipe

Steam density: WeChat mini-program "蒸汽参数计算器"

Signal check: Multimeter on DC voltage (4-20mA = 1-5V normal)


Pro Tip‌: For optimal accuracy, conduct zero calibration during plant shutdown hours.